Could La Maya in Salamanca host a small data centre?

Model a single server rack in La Maya, Salamanca. Hourly solar output shows how much electricity the panels could supply and why the building’s power and fibre connections matter.

A server rack could operate in La Maya, in the province of Salamanca, if the building has enough low-voltage power, cooling and a reliable connection. In a simulation with 2 kW of servers and 10 kWp of solar panels, solar supplied 36% of annual demand when generation and consumption were matched hour by hour. The Santa Teresa dam and local fibre projects illustrate what else a rural installation needs. Hourly PVGIS simulation

Figures checked on 13 and 14 November 2026.

How much electricity does a server rack use?

The example compares continuous IT loads of 2 and 5 kW. Allowing an extra 40% for cooling, electrical losses and auxiliary equipment brings total demand to 2.8 or 7 kW. Over 8,760 hours, that amounts to 24.5 or 61.3 MWh. The 40% allowance gives a power usage effectiveness (PUE) of 1.4. PUE divides the energy used by the whole facility by the energy used by the IT equipment. The actual figure depends on the building, the climate and how heavily the servers are used. EU regulation on calculating energy efficiency

La Maya has low-voltage infrastructure. A 2024 municipal record identifies an i-DE transformer station and a section of the local network. In November 2026, i-DE reported 0 MW of available firm demand capacity at the medium- and high-voltage connection points examined in Santa Teresa, Sieteiglesias de Tormes and Cañadillas. To find out how much power can be contracted for a rack, check the building’s existing supply, its electrical installation and the distributor’s terms. BOCyL low-voltage project record · i-DE’s November report · Changes to an electricity supply

What the dam, solar panels and fibre contribute

Santa Teresa. The reservoir on the River Tormes holds about 496 million cubic metres of water. It regulates river flow and supplies water for users and irrigation. Its hydroelectric plant can concentrate generation in hours of higher demand. Iberdrola lists 21 MW of generating capacity. An IT facility contracts its electricity supply at its own grid connection. Duero River Basin Authority · Hydroelectric plant specifications · Iberdrola

Solar panels. Quinto Armónico documents its role in building a 3.661 MWp solar plant in La Maya. In Guijuelo, the Las Viñas project lists 2.9536 MWp of panels and a maximum grid connection of 2.3 MW. MWp measures the rated peak power of the panels. Output in any given hour depends on sunlight and system conditions. Quinto Armónico · ESOAL’s Las Viñas project

Fibre. As of 30 June 2025, SETELECO’s municipal data recorded fibre-to-the-home coverage for 0 of 84 households. The ministry lists a Masbusiness fibre-to-the-home project covering part of the village of La Maya as completed on 15 April 2026. In 2025, Asteo Red Neutra also pursued interconnections towards Montejo and Fresno Alhándiga. Business service availability, repair terms and upload speed must be checked at the specific address. SETELECO municipal data · Ministry’s 2023 ÚNICO broadband projects · BOCyL record for Montejo · BOCyL record for Fresno Alhándiga

How much solar power could a small data centre use?

The calculation uses the coordinates of La Maya village and all 8,760 hours of 2023 from PVGIS, the European Commission’s solar modelling tool. The hypothetical installation has 10 kWp of free-standing crystalline-silicon panels, facing south at a tilt of 30°, with 14% system losses and no battery. The model estimates 16.0 MWh of annual generation. For each hour, the energy used directly by the servers and auxiliary equipment is the lower of the estimated generation and the facility’s demand. AEMET coordinates for La Maya · European Commission’s PVGIS methodology · Hourly calculation for 10 kWp

Annual model result Rack with a 2 kW IT load Rack with a 5 kW IT load
Total demand 24.5 MWh 61.3 MWh
Solar energy used as it was generated 8.8 MWh 15.6 MWh
Share of demand met by solar power 36.0% 25.5%
Energy imported from the grid 15.7 MWh 45.7 MWh

In the first scenario, 7.2 MWh of solar generation is surplus in hours when demand is too low to use it all. The facility still draws 2.8 kW in hours without sun. At an assumed avoided purchase price of €0.15/kWh, using 8,838 kWh directly would save about €1,326 a year, before taxes, the cost of the panels or any income from surplus energy. The result reflects one historical year of weather and a constant load. For jobs that can run during daylight, repeat the calculation using their actual schedule.

What makes a rural site suitable?

  • Cooling and continuity. A dry space with an air outlet and room to remove heat makes a pilot easier to run. To compare sites under the same load, measure the air temperature at the rack inlet, total energy use and the time taken to restore service after an outage. Valinkey’s guide to high-performance cooling · INCIBE guide to business continuity
  • Access and flood exposure. The A-66 motorway crosses the municipality. The Duero River Basin Authority identifies a 740-metre stretch of the Navalcuervo stream in La Maya with a history of flood risk. When checking flood maps, include access roads and the points where power and fibre enter the site. The dam’s emergency plan is the relevant document for a hypothetical failure of the Santa Teresa dam. Spanish government record of the A-66 route · River basin authority’s Lower Tormes record · MITECO flood maps
  • Workload and connectivity. Batch processing of documents or images allows jobs to be paused and resumed. Interactive services also require latency and availability measurements. If two links are needed, check the route each follows and whether they share infrastructure. Valinkey’s document exercise with local AI

La Maya has low-voltage service, fibre projects and a solar resource that can be modelled. When assessing a site like this, the most influential figures are the power the building can actually use, the upload speed available at the address and the share of working hours that coincide with solar generation.